Gas Turbine Peaking Plant Units 4-7 - Dayton, Ohio |
|||
PraEis' most recent experience in the power plant industry was the Lump Sum Design Build project for DPL Energy consisting of the installation, commissioning and startup of four GE 7EA simple cycle combustion turbine generators and the Balance of Plant work. Praeis managed the Design Build process consisting of team members; IC Construction (Cleveland, OH) the general contractor, Acres International (Buffalo, NY), the designer, the electrical contractor, Wagner-Smith (Dayton, OH), the piping contractor Frebco (Dayton, OH), the heavy hauler is DG Equipment Co. (Brookville, OH) and the centerline erection specialist, Atlantic Projects Company (Schenectady, NY). |
Darby Gas Turbine Peaking
Plant Units 5&6 - |
|||
This was a negotiated Lump Sum Design Build project for DPL Energy
consisting of the installation, commissioning and startup of two GE 7EA
simple cycle combustion turbine generators. The team that successfully
completed this project consisted of ; IC Construction (Cleveland, OH) the
general contractor, Acres International (Buffalo, NY), the designer, the
electrical contractor, Wagner-Smith (Dayton, OH), the piping contractor
Frebco (Dayton, OH), the heavy hauler is DG Equipment Co. (Brookville, OH)
and the centerline erection specialist, Atlantic Projects Company
(Schenectady, NY). |
6801 Brecksville Rd. Ste. 206
Independence, OH 44131-5042 216-525-0600 216-525-0601 fax |
||